What a great day on January 23, 2011. My good friend Barry, K4LOY came over and we went to work. Layed out the measurements for a 40 Meter 4 Square. Used Barry's auger to dig the 5 holes. Put 1 80 lb bag and 1/2 of a 60 lb bag of concrete in each hole. Set the 4x4 supports. Lots of tree cutting and limb triming. Huge progress for a days work. Now to order some DX Engineering radial plates. I already have all the aluminum for the verticals on hand from Texas Towers.
Will post pictures soon !
Tuesday, January 25, 2011
Subscribe to:
Posts (Atom)